All case studies
Fashion · D2C

Converse

Drop-day storefront engineering

A storefront tuned for sneaker drops — peak-traffic surges, queue fairness and zero brand-degrading latency.

Storefront performanceLaunch ops
Problem

Limited-edition drops produced traffic spikes orders of magnitude above baseline. A normal storefront degraded under that load; brand reputation degraded with it.

Approach

We re-engineered the drop pathway: queue, inventory hold, payment and confirmation isolated from baseline traffic. Performance budgets and synthetic load tests turned drop days into rehearsed launches rather than incidents.

Outcome
  • Drop-day uptime under expected surge multiples
  • Queue fairness customers actually trust
  • Engineering treats drop days as scheduled launches
Drop days that feel like launches, not incidents.